[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953209":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953209,690,1,"单选题","风险转移的适用情形不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","风险的转移方和被转移方之间的损失可以清楚地计算和划分",false,{"key":16,"text":17,"correct":18},"B","风险发生的概率相当高，且冒该风险得不偿失",true,{"key":20,"text":21,"correct":14},"C","风险转移的成本低于其他风险管理措施",{"key":23,"text":24,"correct":14},"D","被转移人能够且愿意承担适当的风险","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]