[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953191":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953191,690,1,"单选题","下列关于工程质量控制方法的表述，不正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量控制应以事后控制为主",true,{"key":16,"text":17,"correct":18},"B","对关键工序和重点部位施工过程进行旁站监理",false,{"key":20,"text":21,"correct":18},"C","严格执行现场见证取样和送检制度",{"key":23,"text":24,"correct":18},"D","应采用必要的检查，测量和试验手段，以验证施工质量","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]