[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953182":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953182,690,1,"单选题","改扩建和技术改造建设工程项目，其施工监理费附加调整系数应为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1.0～1.1",false,{"key":16,"text":17,"correct":18},"B","1.1～1.2",true,{"key":20,"text":21,"correct":14},"C","1.1～1.3",{"key":23,"text":24,"correct":14},"D","1.2～1.3","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]