[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953142":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},953142,690,1,"单选题","下列费用中，主要指设计变更及施工过程中可能增加工程量导致的费用是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","基本预备费",true,{"key":16,"text":17,"correct":18},"B","涨价预备费",false,{"key":20,"text":21,"correct":18},"C","生产准备费",{"key":23,"text":24,"correct":18},"D","工程质量监督费","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]