[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953141":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953141,690,1,"单选题","专用设备价款的支付和结算，一般不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","预付款",false,{"key":16,"text":17,"correct":14},"B","阶段付款",{"key":19,"text":20,"correct":21},"C","进度款",true,{"key":23,"text":24,"correct":14},"D","最终付款","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]