[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953138":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},953138,690,1,"单选题","一般在采购合同签订后，设备开始制造前，由买方向卖方提供合同总价的( )作为预付款。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","8%～15%",false,{"key":16,"text":17,"correct":18},"B","10%～20%",true,{"key":20,"text":21,"correct":14},"C","15%～25%",{"key":23,"text":24,"correct":14},"D","20%～30%","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]