[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953107":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953107,690,1,"单选题","合同履行期间，由于工程停建而终止合同或建设单位要求解除合同时，已进行勘察工作的，完成的工作量超过50%时，建设单位应向勘察人支付( )的勘察费。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","实际完成工作量",false,{"key":16,"text":17,"correct":14},"B","预算额50%",{"key":19,"text":20,"correct":14},"C","预算额80%",{"key":22,"text":23,"correct":24},"D","预算额100%",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]