[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953100":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953100,690,1,"单选题","合同中无相应计价项目的小型变更工程适用于的计价方式是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按照成本加利润的原则商定或确定变更工作的单价",false,{"key":16,"text":17,"correct":14},"B","参照类似子目的单价确定变更价格",{"key":19,"text":20,"correct":21},"C","以计日工为依据定价",true,{"key":23,"text":24,"correct":14},"D","重新编制工程项目报价单","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]