[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953083":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},953083,690,1,"单选题","投标有效期，是招标文件中规定的投标文件有效期，从( )起计算。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","发布招标公告至提交投标文件截止日",false,{"key":16,"text":17,"correct":14},"B","发布招标公告至开标日",{"key":19,"text":20,"correct":14},"C","提交投标文件至开标日",{"key":22,"text":23,"correct":24},"D","提交投标文件截止日",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]