[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953065":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},953065,690,1,"单选题","下列不属于建设项目业主负责控制的工程设计主要环节的衔接和管理的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程勘察主要技术成果与参数的审查",false,{"key":16,"text":17,"correct":14},"B","设计方案比选和设计大纲审查",{"key":19,"text":20,"correct":21},"C","协调设备供应厂商提供主要设备技术规格、性能、参数、控制性结构尺寸与基础图",true,{"key":23,"text":24,"correct":14},"D","审定厂(场、坝)址，提出设计建议方案","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目实施","建筑工程",0]