[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-689-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},689,"投资建设项目决策","建筑工程",0,5,50,441,[13,34,46,58,69,80,91,103,115,127,139,151,163,175,187,199,211,222,233,245,257,268,279,287,297,306,315,325,334,344,356,364,376,388,400,412,421,433,445,457,469,481,493,505,516,528,539,551,563,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},952808,1,"单选题","对于计算期不等的互斥方案，要合理选用评价指标或者计算期，使之在时间上具有( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","相关性",false,{"key":24,"text":25,"correct":22},"B","连带性",{"key":27,"text":28,"correct":29},"C","可比性",true,{"key":31,"text":32,"correct":22},"D","有限性","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},952809,"当某建设项目的计算期大于( )年时，可以把此建设项目近似当做计算期无限的建设项目进行经济比选。",[38,40,42,44],{"key":20,"text":39,"correct":22},"10",{"key":24,"text":41,"correct":22},"20",{"key":27,"text":43,"correct":29},"50",{"key":31,"text":45,"correct":22},"80",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},952810,"下列分析方法中，( )一般用于评价公用事业建设方案的经济效果。",[50,52,54,56],{"key":20,"text":51,"correct":22},"差额投资内部收益率法",{"key":24,"text":53,"correct":22},"最低价格比较法",{"key":27,"text":55,"correct":29},"效益\u002F费用比较法",{"key":31,"text":57,"correct":22},"净年值比较法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},952811,"对产品产量不同、产品价格又难以确定的比选方案，当其产品为单一产品或能折合为单一产品时，可采用( )。",[62,64,65,67],{"key":20,"text":63,"correct":22},"最小公倍数法",{"key":24,"text":53,"correct":29},{"key":27,"text":66,"correct":22},"净现值率法",{"key":31,"text":68,"correct":22},"年折算费用法",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},952812,"下列选项中，( )是根据对市场前景的预测，直接选取一个适当的分析期作为各个方案共同的计算期。",[73,74,76,78],{"key":20,"text":66,"correct":22},{"key":24,"text":75,"correct":22},"最小公倍数",{"key":27,"text":77,"correct":22},"增量投资回收期",{"key":31,"text":79,"correct":29},"研究期法",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":27,"analysis":33},952813,"下列选择中，( )用于计算期不同的互斥方案的经济比选时，必须运用合理的方法把各方案换算为相同的计算期，在此基础上各方案就有了可比性，然后运用相关计算方法和评判准则进行经济比选。",[84,86,87,89],{"key":20,"text":85,"correct":22},"净年值法和费用年值法",{"key":24,"text":55,"correct":22},{"key":27,"text":88,"correct":29},"净现值法和费用现值法",{"key":31,"text":90,"correct":22},"增量投资回收期法",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},952814,"下列投资方案经济评价指标中，属于静态评价指标的是( )。",[95,97,99,101],{"key":20,"text":96,"correct":22},"内部收益率",{"key":24,"text":98,"correct":22},"净现值",{"key":27,"text":100,"correct":29},"利息备付率",{"key":31,"text":102,"correct":22},"净年值",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},952815,"两个方案的计算期相同，甲方案投资为10000万元，年经营成本为8000万元，乙方案投资为8000万元，年经营成本为9000万元。两个方案同时投入使用，效益相同，若基准投资收益率为20%，则用增量投资收益率选择方案时正确的说法是( )。",[107,109,111,113],{"key":20,"text":108,"correct":29},"甲方案为优选方案",{"key":24,"text":110,"correct":22},"乙方案为优选方案",{"key":27,"text":112,"correct":22},"计算出的基准收益率等于20%",{"key":31,"text":114,"correct":22},"计算出的基准收益率小于20%",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":27,"analysis":33},952816,"建设方案经济比选的前提条件是( )。",[119,121,123,125],{"key":20,"text":120,"correct":22},"安全性原则",{"key":24,"text":122,"correct":22},"适用性原则",{"key":27,"text":124,"correct":29},"可比性原则",{"key":31,"text":126,"correct":22},"经济性原则",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},952817,"建设项目的不同阶段存在的主要风险有所不同，投资决策阶段的风险主要包括( )等。",[131,133,135,137],{"key":20,"text":132,"correct":22},"工程风险、建设风险",{"key":24,"text":134,"correct":29},"政策风险、融资风险",{"key":27,"text":136,"correct":22},"市场风险、管理风险",{"key":31,"text":138,"correct":22},"融资风险、工程风险",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},952818,"下列选项中，( )是建设项目决策过程中的重要环节，其目的是帮助决策者更理性地思考，从而实现科学决策。",[143,145,147,149],{"key":20,"text":144,"correct":22},"风险控制",{"key":24,"text":146,"correct":29},"风险分析",{"key":27,"text":148,"correct":22},"风险识别",{"key":31,"text":150,"correct":22},"风险评价",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":27,"analysis":33},952819,"建设项目的主要风险中，( )是指由于项目存在众多参与方，各方的动机和目的不一致将导致项目合作的风险，影响项目的进展和项目目标的实现。",[155,157,159,161],{"key":20,"text":156,"correct":22},"管理风险",{"key":24,"text":158,"correct":22},"政策风险",{"key":27,"text":160,"correct":29},"组织风险",{"key":31,"text":162,"correct":22},"社会风险",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},952820,"下列选项中，( )在项目预算中要单独列出，不能分散到具体费用项目之下，否则，项目班子就会失去对支出的控制。",[167,169,171,173],{"key":20,"text":168,"correct":22},"预算进度款",{"key":24,"text":170,"correct":29},"预算应急费",{"key":27,"text":172,"correct":22},"保证金",{"key":31,"text":174,"correct":22},"预付款",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},952821,"风险估计通常采用定性分析与定量分析相结合的估计方法，定性估计通常采用( )。",[179,181,183,185],{"key":20,"text":180,"correct":22},"概率分析法",{"key":24,"text":182,"correct":22},"蒙特卡罗模拟法",{"key":27,"text":184,"correct":22},"因果分析法",{"key":31,"text":186,"correct":29},"专家调查法",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},952822,"风险量可以根据( )两个指标来确定。",[191,193,195,197],{"key":20,"text":192,"correct":29},"风险发生的概率与风险出现后造成的损失程度",{"key":24,"text":194,"correct":22},"风险发生的因素与风险出现后主体的承受能力",{"key":27,"text":196,"correct":22},"风险发生的概率与风险出现后主体的承受能力",{"key":31,"text":198,"correct":22},"风险发生的因素与风险出现后造成的损失程度",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},952823,"风险影响等级的定义中，一旦风险发生，对于项目对应部分的目标受到影响，但不影响整体目标的风险影响等级为( )风险。",[203,205,207,209],{"key":20,"text":204,"correct":22},"可忽略",{"key":24,"text":206,"correct":29},"微小",{"key":27,"text":208,"correct":22},"一般",{"key":31,"text":210,"correct":22},"关键",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},952824,"下列风险对策中，( )策略适用于已知有风险存在，但可获高利甘愿冒险的项目。",[215,216,218,220],{"key":20,"text":146,"correct":22},{"key":24,"text":217,"correct":22},"风险转移",{"key":27,"text":219,"correct":22},"风险抑制",{"key":31,"text":221,"correct":29},"风险自担",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},952825,"下列风险划分的程度中，( )发生的可能性大，风险造成的损失大，将使项目由可行转变为不可行，需要采取积极有效的防范措施。",[226,228,230,232],{"key":20,"text":227,"correct":22},"较大风险",{"key":24,"text":229,"correct":22},"特殊风险",{"key":27,"text":231,"correct":29},"严重风险",{"key":31,"text":227,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},952826,"私人投资决策取决于决策者的风险偏好，对于风险热爱型投资者，一般采取( )准则。",[237,239,241,243],{"key":20,"text":238,"correct":22},"系统分析决策",{"key":24,"text":240,"correct":22},"最小损失决策",{"key":27,"text":242,"correct":22},"期望值决策",{"key":31,"text":244,"correct":29},"最大盈利决策",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},952827,"价格的变化包括产品或服务的价格、原材料的价格和其他投入物价格的变化等，必须挖掘最关键的风险因素，才能制定有效的风险应对措施，这体现的是风险的( )。",[249,251,253,255],{"key":20,"text":250,"correct":22},"阶段性",{"key":24,"text":252,"correct":22},"相对性",{"key":27,"text":254,"correct":29},"层次性",{"key":31,"text":256,"correct":22},"系统性",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},952828,"对某些人力难以控制的灾害性风险可以采取( )方式。",[261,263,265,266],{"key":20,"text":262,"correct":22},"风险回避",{"key":24,"text":264,"correct":29},"保险转移",{"key":27,"text":221,"correct":22},{"key":31,"text":267,"correct":22},"非保险转移",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},952829,"风险对策研究的要求中，风险对策研究应有很强的( )，应结合行业特点，对特定项目主要的或关键的风险因素提出必要的措施，将其不利影响降低到最低程度。",[272,273,275,277],{"key":20,"text":256,"correct":22},{"key":24,"text":274,"correct":29},"针对性",{"key":27,"text":276,"correct":22},"经济性",{"key":31,"text":278,"correct":22},"可行性",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":27,"analysis":33},952830,"下列选项中，( )是彻底规避风险的一种做法，即断绝风险的来源。",[283,284,285,286],{"key":20,"text":217,"correct":22},{"key":24,"text":221,"correct":22},{"key":27,"text":262,"correct":29},{"key":31,"text":219,"correct":22},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},952831,"风险是否发生，风险事件的后果如何都是难以确定的，可以通过历史数据和经验，对风险发生的可能性和后果进行一定的分析预测，这体现的是风险的( )。",[291,292,293,295],{"key":20,"text":254,"correct":22},{"key":24,"text":256,"correct":22},{"key":27,"text":294,"correct":29},"可变性",{"key":31,"text":296,"correct":22},"多样性",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},952832,"下列选项中，( )是在风险估计的基础上，对风险程度进行划分，以揭示影响项目成败的关键风险因素，以便针对关键风险因素，采取防范对策。",[301,302,303,304],{"key":20,"text":144,"correct":22},{"key":24,"text":146,"correct":22},{"key":27,"text":150,"correct":29},{"key":31,"text":305,"correct":22},"风险对策",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},952833,"对风险的识别和评价可以采用最简单、最易操作的( )。",[310,311,313,314],{"key":20,"text":180,"correct":22},{"key":24,"text":312,"correct":22},"风险解析法",{"key":27,"text":184,"correct":22},{"key":31,"text":186,"correct":29},{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},952834,"风险影响等级的定义中，一旦发生风险，将导致整个项目的目标失败的风险影响等级为( )风险。",[319,320,322,323],{"key":20,"text":208,"correct":22},{"key":24,"text":321,"correct":22},"严重",{"key":27,"text":210,"correct":29},{"key":31,"text":324,"correct":22},"特殊",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},952835,"风险分析的基础是( )。",[329,330,331,332],{"key":20,"text":146,"correct":22},{"key":24,"text":150,"correct":22},{"key":27,"text":148,"correct":29},{"key":31,"text":333,"correct":22},"风险估计",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},952836,"对于概率服从离散型分布的风险因素，可采用( )。",[338,340,341,342],{"key":20,"text":339,"correct":22},"模拟计算法",{"key":24,"text":186,"correct":22},{"key":27,"text":184,"correct":22},{"key":31,"text":343,"correct":29},"理论计算法",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},952837,"下列规避管理风险的主要措施不包括( )。",[348,350,352,354],{"key":20,"text":349,"correct":22},"加强团队建设",{"key":24,"text":351,"correct":22},"合理设计项目的管理模式",{"key":27,"text":353,"correct":22},"选择适当的管理者",{"key":31,"text":355,"correct":29},"完善项目各参与方的合同，加强合同管理",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},952838,"实行( )策略要遵循的原则之一是必须让承担风险者得到相应的报酬。",[360,361,362,363],{"key":20,"text":219,"correct":22},{"key":24,"text":221,"correct":22},{"key":27,"text":217,"correct":29},{"key":31,"text":262,"correct":22},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},952839,"概率分析是运用概率论和数理统计原理，对风险因素的概率分布和风险因素对评价指标的影响进行( )分析。",[368,370,372,374],{"key":20,"text":369,"correct":22},"定性",{"key":24,"text":371,"correct":22},"因果",{"key":27,"text":373,"correct":29},"定量",{"key":31,"text":375,"correct":22},"定性和定量结合",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},952840,"某技术方案年设计生产能力为10台，年固定成本为1200万元，产品单台销售价格为900元，单台产品可变成本为560元，单台产品营业税金及附加为120元，则盈亏平衡点的产销量为( )台。",[380,382,384,386],{"key":20,"text":381,"correct":22},"23568",{"key":24,"text":383,"correct":22},"35485",{"key":27,"text":385,"correct":29},"54545",{"key":31,"text":387,"correct":22},"65455",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},952841,"某企业项目可行性研究中采用的产品销售价格为5200元\u002Fkg，采用专家定量评定法计算的最乐观值、最可能值、期望平均值分别为1300、600、4740元\u002Fkg，则该项目销售价格的偏差程度是( )。",[392,394,396,398],{"key":20,"text":393,"correct":29},"-8.85%",{"key":24,"text":395,"correct":22},"-7.29%",{"key":27,"text":397,"correct":22},"8.85%",{"key":31,"text":399,"correct":22},"7.29%",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},952842,"( )是风险下项目的决策依据，因为存在风险导致项目决策的指标不再具有单一确定的结果，而是存在多种可能性，使得决策变得复杂。",[404,406,408,410],{"key":20,"text":405,"correct":22},"政府决策",{"key":24,"text":407,"correct":29},"风险决策准则",{"key":27,"text":409,"correct":22},"风险抑制决策",{"key":31,"text":411,"correct":22},"风险损失对策",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},952843,"下列方法中，( )的特点是用数学方法在计算机上模拟实际事物发生的概率过程，然后对其进行统计处理并给出其概率统计分布。",[416,417,418,419],{"key":20,"text":186,"correct":22},{"key":24,"text":182,"correct":29},{"key":27,"text":184,"correct":22},{"key":31,"text":420,"correct":22},"风险分析法",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},952844,"采用专家调查法时，所选择的专家应熟悉该行业和所评估的风险因素，并能做到( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"科学合理",{"key":24,"text":428,"correct":29},"客观公正",{"key":27,"text":430,"correct":22},"系统完整",{"key":31,"text":432,"correct":22},"系统精确",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},952845,"可行性研究一般从行业或企业角度，论证项目建设的必要性、市场前景、技术和经济的可行性，着重项目投资的( )。",[437,439,441,443],{"key":20,"text":438,"correct":22},"宏观效益",{"key":24,"text":440,"correct":29},"微观效益",{"key":27,"text":442,"correct":22},"整体效益",{"key":31,"text":444,"correct":22},"风险效益",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},952846,"企业或机构投资者委托的评估项目，将重点评估项目本身的( )等方面。",[449,451,453,455],{"key":20,"text":450,"correct":22},"生产能力、资金的回收性和供应风险",{"key":24,"text":452,"correct":22},"需求能力、资金的流动性和市场风险",{"key":27,"text":454,"correct":29},"盈利能力、资金的流动性和财务风险",{"key":31,"text":456,"correct":22},"盈利能力、资金的回收性和供应风险",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},952847,"下列原则中，( )已成为投资项目建设必须遵循的基本原则和投资主管部门审批的前置条件。",[461,463,465,467],{"key":20,"text":462,"correct":22},"科学决策原则",{"key":24,"text":464,"correct":22},"民主决策原则",{"key":27,"text":466,"correct":22},"风险责任原则",{"key":31,"text":468,"correct":29},"可持续发展原则",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},952848,"深化投资体制改革的一个基本出发点，就是要改进既有投资项目的决策规则和程序，提高投资决策的( )水平。",[473,475,477,479],{"key":20,"text":474,"correct":29},"科学化、民主化",{"key":24,"text":476,"correct":22},"系统化、民主化",{"key":27,"text":478,"correct":22},"科学化、系统化",{"key":31,"text":480,"correct":22},"整体化、民主化",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},952849,"下列外商投资项目申请报告中不包括的是( )。",[485,487,489,491],{"key":20,"text":486,"correct":29},"购并或参股项目，应说明拟购并或参股公司的具体情况",{"key":24,"text":488,"correct":22},"项目总投资、注册资本及各方出资额、出资方式及融资方案，需要进口设备及金额",{"key":27,"text":490,"correct":22},"项目建设规模，采用的主要技术和工艺，产品目标市场，计划用工人数",{"key":31,"text":492,"correct":22},"涉及公共产品或服务的价格",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},952850,"下列情况中不宜采用竞争性谈判的是( )。",[497,499,501,503],{"key":20,"text":498,"correct":29},"由于咨询服务的性质，招标人必须与咨询公司进行谈判",{"key":24,"text":500,"correct":22},"急需得到某种咨询服务，采用公开或邀请招标方式因耗时太久而不可行",{"key":27,"text":502,"correct":22},"所涉及服务或风险的性质不允许事先作出总体定价",{"key":31,"text":504,"correct":22},"由于保护专属权的原因，咨询服务只能由特定的咨询公司提供",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},952851,"建设项目投资决策对于项目的成败具有( )的作用。",[509,511,513,515],{"key":20,"text":510,"correct":22},"指导性",{"key":24,"text":512,"correct":29},"决定性",{"key":27,"text":514,"correct":22},"强制性",{"key":31,"text":256,"correct":22},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},952852,"下列选项中，( )是对政府关注的涉及公共利益的有关问题进行论证说明，以获得政府投资主管部门的核准。",[520,522,524,526],{"key":20,"text":521,"correct":22},"技术评审报告",{"key":24,"text":523,"correct":29},"项目申请报告",{"key":27,"text":525,"correct":22},"可行性研究报告",{"key":31,"text":527,"correct":22},"项目审批报告",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},952853,"企业投资者为了分析初步可行性研究、可行性研究报告的( )，往往聘请另一家工程咨询单位对初步可行性研究和可行性研究报告进行评估，作为企业内部决策的依据。",[532,534,536,537],{"key":20,"text":533,"correct":22},"真实性",{"key":24,"text":535,"correct":29},"可靠性",{"key":27,"text":256,"correct":22},{"key":31,"text":538,"correct":22},"科学性",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},952854,"对于政府投资项目，按照投资建设项目( )的制度。",[543,545,547,549],{"key":20,"text":544,"correct":22},"\"先规划，后评估\"",{"key":24,"text":546,"correct":29},"\"先评估，后决策\"",{"key":27,"text":548,"correct":22},"\"先评估，后规划\"",{"key":31,"text":550,"correct":22},"\"先决策，后规划\"",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},952855,"下列选项中，( )是在机会研究的基础上，对项目方案进行初步的技术、财务、经济、环境和社会影响评价，对项目是否可行作出初步判断。",[555,557,559,561],{"key":20,"text":556,"correct":22},"系统投资机会研究",{"key":24,"text":558,"correct":29},"预可行性研究",{"key":27,"text":560,"correct":22},"可行性研究",{"key":31,"text":562,"correct":22},"项目申请报告研究",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},952856,"下列选项中，( )主要是项目法人和企业内部决策的依据，是项目评估的重要基础和前提。",[567,569,571,572],{"key":20,"text":568,"correct":22},"初步可行性研究",{"key":24,"text":570,"correct":22},"项目技术研究",{"key":27,"text":560,"correct":29},{"key":31,"text":573,"correct":22},"项目评估",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},952857,"可行性研究报告应按照项目建设方案确定的工程量测算项目总投资，投资估算与初步设计概算比较不应大于( )，资金筹措应有具体方案，项目效益测算以动态为主等。",[578,580,582,584],{"key":20,"text":579,"correct":22},"5%",{"key":24,"text":581,"correct":29},"10%",{"key":27,"text":583,"correct":22},"15%",{"key":31,"text":585,"correct":22},"20%",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]