[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953028":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953028,689,2,"多选题","依行业和项目不同具有特殊性，不同的行业和不同的项目具有不同的风险，基础设施项目的主要风险则可能是( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程风险",true,{"key":16,"text":17,"correct":18},"B","市场风险",false,{"key":20,"text":21,"correct":18},"C","建设风险",{"key":23,"text":24,"correct":18},"D","融资风险",{"key":26,"text":27,"correct":14},"E","政策风险","AE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]