[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953019":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953019,689,2,"多选题","为了应对风险自担，可以采取事先制订好后备措施，一旦项目实际进展情况与计划不同，就需动用后备措施，主要有( )等后备措施。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","质量",false,{"key":16,"text":17,"correct":18},"B","费用",true,{"key":20,"text":21,"correct":14},"C","安全",{"key":23,"text":24,"correct":18},"D","进度",{"key":26,"text":27,"correct":18},"E","技术","BDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]