[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953013":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953013,689,2,"多选题","净现值率排序法是指按净现值率的大小顺序选择方案的方法，这种方法的具体做法是( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","计算各项目的净现值率",true,{"key":16,"text":17,"correct":14},"B","按净现值率由大到小排序",{"key":19,"text":20,"correct":14},"C","按净现值率排序选择项目至资金约束条件为止",{"key":22,"text":23,"correct":24},"D","从保留的组合方案中选择净现值最大的组合方案",false,{"key":26,"text":27,"correct":24},"E","保留投资额不超过投资限额且净现值大于等于零的方案","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]