[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952997":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952997,689,2,"多选题","利益相关者分析一般按照( )等步骤进行。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","界定利益相关者",true,{"key":16,"text":17,"correct":18},"B","分析利益相关者的态度和接纳程度",false,{"key":20,"text":21,"correct":14},"C","分析对每个利益相关者的重要性和影响力",{"key":23,"text":24,"correct":14},"D","分析利益相关者的利益构成以及建设项目对他们的利益所产生的影响",{"key":26,"text":27,"correct":14},"E","为重要的利益相关者制定出相应的参与方案","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]