[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952983":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952983,689,2,"多选题","一般情况下，按照经济分析费用与效益的划分原则，项目实际征地费用可以划分为( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","机会成本",true,{"key":16,"text":17,"correct":14},"B","新增资源消耗",{"key":19,"text":20,"correct":21},"C","沉没成本",false,{"key":23,"text":24,"correct":21},"D","税金",{"key":26,"text":27,"correct":14},"E","转移支付","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]