[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952980":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952980,689,2,"多选题","对于采用各种手段使得项目耗用资源得到节约、运营费用得到降低的项目，其效益表现为费用的节约，在计算中应注意( )等。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","从阶段项目周期费用的角度进行分析，既要分析建设投资成本，也应分析总投资费用",false,{"key":16,"text":17,"correct":18},"B","按照有无对比原则，分析\"有项目\"和\"无项目\"两种情况下的费用变动趋势",true,{"key":20,"text":21,"correct":18},"C","从整个项目周期费用的角度进行分析，既要分析初始建设投资费用，也应分析运营期费用",{"key":23,"text":24,"correct":14},"D","从广义费用的角度进行分析，既要分析项目实体付出的费用，也要分析各种管理费用、期间费用",{"key":26,"text":27,"correct":18},"E","在费用节省的分析计算中应注意避免重复计算","BCE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]