[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952944":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952944,689,2,"多选题","根据工程建设其他费用构成，引进技术和进口设备其他费用的内容包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","技术引进费",true,{"key":16,"text":17,"correct":18},"B","车辆购置附加费",false,{"key":20,"text":21,"correct":14},"C","担保费",{"key":23,"text":24,"correct":18},"D","设备供销部门手续费",{"key":26,"text":27,"correct":14},"E","进口设备检验鉴定费","ACE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]