[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952939":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952939,689,2,"多选题","下列不属于与项目建设有关的其他费用的是( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","土地使用费",true,{"key":16,"text":17,"correct":14},"B","生产准备费",{"key":19,"text":20,"correct":21},"C","研究试验费",false,{"key":23,"text":24,"correct":21},"D","工程监理费",{"key":26,"text":27,"correct":14},"E","联合试运转费","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]