[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952937":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952937,689,2,"多选题","项目所需流动资金的估算方法可采用( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","概算指标法",false,{"key":16,"text":17,"correct":18},"B","分项详细估算法",true,{"key":20,"text":21,"correct":14},"C","扩大单价法",{"key":23,"text":24,"correct":18},"D","扩大指标估算法",{"key":26,"text":27,"correct":14},"E","概算定额法","BD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]