[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952922":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952922,689,2,"多选题","主要从下列( )等方面分析建设项目与环境影响有关的情况。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工艺过程",true,{"key":16,"text":17,"correct":18},"B","环境质量参数",false,{"key":20,"text":21,"correct":14},"C","资源、能源的储运",{"key":23,"text":24,"correct":14},"D","交通运输",{"key":26,"text":27,"correct":14},"E","厂地的开发利用","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]