[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952917":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952917,689,2,"多选题","项目环境影响报告书应包括( )等。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","环境质量状况",false,{"key":16,"text":17,"correct":18},"B","建设项目概况及工程分析",true,{"key":20,"text":21,"correct":14},"C","评价适用标准",{"key":23,"text":24,"correct":18},"D","建设项目周围环境现状",{"key":26,"text":27,"correct":18},"E","建设项目环境影响的经济损益分析","BDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]