[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952905":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952905,689,2,"多选题","涉及多金属、多用途化学元素共生矿、伴生矿以及油气混合矿等综合利用的建设项目，应根据资源特征提出综合利用方案，内容包括( )等。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","阐述项目占用的资源品种、数量和来源，提出合理的资源供应方案",true,{"key":16,"text":17,"correct":14},"B","多金属、多用途化学元素共生矿、伴生矿、油气混合矿等的资源综合利用方案",{"key":19,"text":20,"correct":14},"C","通过资源循环再生利用率等指标的国内外先进水平对比分析，评价拟建项目资源利用效率的先进性",{"key":22,"text":23,"correct":24},"D","通过单位生产能力主要资源消耗量等指标的国内外技术水平对比分析，评价拟建项目资源利用效率的合理性",false,{"key":26,"text":27,"correct":14},"E","分析资源利用是否会对地表(下)水等其他资源造成不利影响，以提高资源利用的综合效率","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]