[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952902":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952902,689,2,"多选题","项目工艺技术方案和工艺流程方案的选择原则中，衡量先进性的主要标准有( )等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","劳动生产率和成品率",true,{"key":16,"text":17,"correct":14},"B","产品的水平和档次",{"key":19,"text":20,"correct":14},"C","产品单位物耗和能耗指标",{"key":22,"text":23,"correct":14},"D","产品的性能和质量",{"key":25,"text":26,"correct":27},"E","能解决原材料、燃料和关键配套件的协作供应",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目决策","建筑工程",0]