[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952834":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},952834,689,1,"单选题","风险影响等级的定义中，一旦发生风险，将导致整个项目的目标失败的风险影响等级为( )风险。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一般",false,{"key":16,"text":17,"correct":14},"B","严重",{"key":19,"text":20,"correct":21},"C","关键",true,{"key":23,"text":24,"correct":14},"D","特殊","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]