[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952825":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":24},952825,689,1,"单选题","下列风险划分的程度中，( )发生的可能性大，风险造成的损失大，将使项目由可行转变为不可行，需要采取积极有效的防范措施。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","较大风险",false,{"key":16,"text":17,"correct":14},"B","特殊风险",{"key":19,"text":20,"correct":21},"C","严重风险",true,{"key":23,"text":13,"correct":14},"D","",{"id":6,"name":26,"category":27,"favorite":28},"投资建设项目决策","建筑工程",0]