[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952794":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},952794,689,1,"单选题","在评价利益相关者的( )的过程中，必须调查与项目存在利害关系的人们的意见，调查他们能否在建设项目的实施、运营、维护和监督过程中继续或扩大他们的积极参与。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","态度或接纳程度",false,{"key":16,"text":17,"correct":14},"B","能力评估",{"key":19,"text":20,"correct":14},"C","矩阵分析",{"key":22,"text":23,"correct":24},"D","需求或预期",true,"",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]