[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952672":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},952672,689,1,"单选题","实行( )的建设项目，应在报送可行性研究报告前完成环境影响评价文件报批手续。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","审批制",true,{"key":16,"text":17,"correct":18},"B","核准制",false,{"key":20,"text":21,"correct":18},"C","注册制",{"key":23,"text":24,"correct":18},"D","备案制","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]