[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952666":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},952666,689,1,"单选题","下列规划环境影响评价文件的审查意见不正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境影响评价结论的有效性",true,{"key":16,"text":17,"correct":18},"B","基础资料、数据的真实性",false,{"key":20,"text":21,"correct":18},"C","公众意见采纳与不采纳情况及其理由的说明的合理性",{"key":23,"text":24,"correct":18},"D","环境影响分析、预测和评估的可靠性","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]