[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952660":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},952660,689,1,"单选题","下列选项中，( )主要是观察项目所造成环境变化对市场上货物和服务数量和质量变化的影响，然后用市场价格把这些变化换算成为货币价值。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","直接市场评价法",true,{"key":16,"text":17,"correct":18},"B","政府指导评价法",false,{"key":20,"text":21,"correct":18},"C","替代市场评价法",{"key":23,"text":24,"correct":18},"D","间接市场评价法","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]