[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952659":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},952659,689,1,"单选题","在评价时间允许，评价工作要求较高，又有可供参考的相同或相似的现有工程时，应采用( )进行分析。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","专业判断法",false,{"key":16,"text":17,"correct":14},"B","物料平衡计算法",{"key":19,"text":20,"correct":21},"C","类比分析法",true,{"key":23,"text":24,"correct":14},"D","资料查阅分析法","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]