[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952624":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},952624,689,1,"单选题","建设项目选用的技术方案和工艺流程必须是( )的，既要立足于高技术起点，又要防止盲目追求尚不成熟或仍处在试验阶段的新技术。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全可靠",false,{"key":16,"text":17,"correct":18},"B","先进适用",true,{"key":20,"text":21,"correct":14},"C","科学经济",{"key":23,"text":24,"correct":14},"D","系统科学","",{"id":6,"name":27,"category":28,"favorite":29},"投资建设项目决策","建筑工程",0]