[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952574":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952574,688,2,"多选题","根据《企业投资项目核准暂行办法》(2004年本)规定，项目申请报告的内容主要包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目申报单位情况",true,{"key":16,"text":17,"correct":18},"B","已建项目情况",false,{"key":20,"text":21,"correct":14},"C","建设用地与相关规划",{"key":23,"text":24,"correct":14},"D","资源利用和能源耗用分析",{"key":26,"text":27,"correct":14},"E","经济和社会效果分析","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"宏观经纪政策","建筑工程",0]