[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-952509":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},952509,688,2,"多选题","根据《关于加强建设项目环境影响评价分级审批的通知》的规定，实行备案制的建设项目，建设单位应当在( )完成环境影响评价文件报批手续。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","报送可行性研究报告前",false,{"key":16,"text":17,"correct":18},"B","办理备案手续后",true,{"key":20,"text":21,"correct":14},"C","提交项目申请报告前",{"key":23,"text":24,"correct":18},"D","项目开工前",{"key":26,"text":27,"correct":14},"E","项目开工后","BD","",{"id":6,"name":31,"category":32,"favorite":33},"宏观经纪政策","建筑工程",0]