[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-949890":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},949890,686,1,"单选题","下列不可抗力的发生可以构成免责事由的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","甲委托乙制造一批家具，后乙住所地发生台风，但乙的厂房并没有收到任何损害",false,{"key":16,"text":17,"correct":14},"B","甲乙约定15日交货，乙迟迟未交，20日，乙住所地发生暴风雨，原料受损",{"key":19,"text":20,"correct":14},"C","甲接受乙的委托，为其加工棉花，棉花加工机器损坏致使无法按时交货",{"key":22,"text":23,"correct":24},"D","甲出国，委托乙保管其书籍，后由于火山爆发引起乙家房屋起火，书籍被烧",true,"不可抗力，是指不能预见、不能避免并不能克服的客观情况。并不是所有不可抗力的发生都能构成违约的免责事由，只有不可抗力发生在合同履行期内并且影响到合同的履行时才可以免责。A项的台风没有对合同履行造成影响；B项属于乙迟延履行后发生的不可抗力，不能免责；C项不属于不可抗力。",{"id":6,"name":27,"category":28,"favorite":29},"土地登记相关法律知识","建筑工程",0]