[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948734":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},948734,684,2,"多选题","土地勘测定界过程中，外业测量情况包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","导线点的个数",true,{"key":16,"text":17,"correct":18},"B","面积量算及汇总",false,{"key":20,"text":21,"correct":14},"C","采用的测量仪器",{"key":23,"text":24,"correct":18},"D","编绘勘测定界图",{"key":26,"text":27,"correct":14},"E","测区基本情况","ACE","土地勘测定界过程中，外业测量情况包括测区基本情况、勘测定界坐标系统的选择，平面控制的布设形式，导线的长度，导线点的个数，放样方法，界址桩的设置，采用的测量仪器等。内业工作情况包括面积量算及汇总、编绘勘测定界图等情况。",{"id":6,"name":31,"category":32,"favorite":33},"地籍调查","建筑工程",0]