[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948718":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},948718,684,2,"多选题","勘测定界平面控制网的布设形式中，采用三角网布设控制网的缺点是（ ）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","布网困难较大",true,{"key":16,"text":17,"correct":14},"B","有时要考虑架高标",{"key":19,"text":20,"correct":21},"C","不易发现观测中的粗差",false,{"key":23,"text":24,"correct":14},"D","在隐蔽地带易受障碍物的影响",{"key":26,"text":27,"correct":14},"E","在平原地区易受障碍物的影响","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"地籍调查","建筑工程",0]