[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948714":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},948714,684,2,"多选题","经批准的项目用地界址桩的设置原则有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","界址之间的距离，直线最长为150m",true,{"key":16,"text":17,"correct":14},"B","曲拆线的主要转折点埋桩",{"key":19,"text":20,"correct":14},"C","如果项目用地范围行政隶属不同，应在用地界线与行政界线交点上加设界址桩",{"key":22,"text":23,"correct":24},"D","基本农田界线与用地界线的交点不必加设界址桩",false,{"key":26,"text":27,"correct":14},"E","国有土地与集体土地的分界线与用地界线的交点应加设界址桩","ABCE","D项，基本农田界线与用地界线的交点及国有土地与集体土地的分界线与用地界线的交点应加设界址桩。",{"id":6,"name":31,"category":32,"favorite":33},"地籍调查","建筑工程",0]