[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948527":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},948527,684,2,"多选题","地籍平面控制测量的作业包括技术设计、（ ）等步骤。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","实地选点",true,{"key":16,"text":17,"correct":14},"B","埋设标石",{"key":19,"text":20,"correct":14},"C","野外观测",{"key":22,"text":23,"correct":14},"D","内业平差计算",{"key":25,"text":26,"correct":27},"E","制图",false,"ABCD","控制测量作业包括技术设计、实地选点、标石埋设、观测和平差计算等主要步骤。平面控制网的观测元素主要是水平方向值、斜距和天顶距。对于斜距的气象改正，还应观测气温、气压。",{"id":6,"name":31,"category":32,"favorite":33},"地籍调查","建筑工程",0]