[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948448":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},948448,684,2,"多选题","在开展变更地籍调查工作之前，要做好资料的准备工作，主要包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","初始登记申请书",true,{"key":16,"text":17,"correct":14},"B","有关的界址点坐标",{"key":19,"text":20,"correct":14},"C","必要的变更数据的准备",{"key":22,"text":23,"correct":24},"D","表格的准备",false,{"key":26,"text":27,"correct":14},"E","变更宗地附近测量控制点成果","ABCE","开展变更地籍调查工作之前，资料的准备工作主要包括：初始登记申请书、变更登记申请书、本宗地的原有地籍图及宗地图的复印件、本宗地及相邻宗地的地籍档案复印件、有关的界址点坐标、必要的变更数据的准备(如分割放样元素的计算)、变更宗地附近测量控制点成果(坐标、点之记或点位说明、控制点网图)。",{"id":6,"name":31,"category":32,"favorite":33},"地籍调查","建筑工程",0]