[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948405":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},948405,684,1,"单选题","如果根据实际情况，需要把某周的周一设定为休息日，这时要用到系统的（ ）功能。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","地籍档案管理",false,{"key":16,"text":17,"correct":14},"B","元数据处理",{"key":19,"text":20,"correct":14},"C","数据处理",{"key":22,"text":23,"correct":24},"D","系统维护",true,"采用系统维护功能中的工作日设定模块可以对办件时间进行具体设定。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]