[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948380":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},948380,684,1,"单选题","勘测定界图是利用放样后复测的界址点坐标及调查成果，在（ ）上编绘或直接测绘的区域性专用图。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地籍图或地形图",true,{"key":16,"text":17,"correct":18},"B","宗地图",false,{"key":20,"text":21,"correct":18},"C","宗地草图",{"key":23,"text":24,"correct":18},"D","编绘底图","勘测定界图是利用放样后复测的界址点坐标及调查成果，在地籍图或地形图上编绘或直接测绘的区域性专用图。利用现有的地籍图或地形图时，应检查其现势性，发现有变化的，应及时进行修测或补测。没有现势性较好的地籍图或地形图时，应在勘测定界前直接测绘地形图，作为调查工作底图及编绘底图。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]