[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948371":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},948371,684,1,"单选题","下列项目可以不进行界址测量的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","政府用于审批的项目",false,{"key":16,"text":17,"correct":14},"B","国家支持的项目",{"key":19,"text":20,"correct":14},"C","政府重点项目",{"key":22,"text":23,"correct":24},"D","经有权批准项目用地的政府国土资源管理部门认可的项目",true,"为保证界址放样的可靠性及界址坐标的精度，在界址桩放样埋设后，须用解析法进行界址测量，界址测量应按照《城镇地籍调查技术规程》的要求进行。政府用于审批的项目用地的界址点必须进行界址测量，经测量的界址点坐标才能作为审批坐标。项目用地初步设计的界址点坐标、项目工程总平面布置图上的界址点坐标只能作为勘测定界放样数据准备的依据，不能作为审批坐标。个别项目用地经有权批准项目用地的政府国土资源管理部门认可，可以不进行界址测量。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]