[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948351":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},948351,684,1,"单选题","工作底图的现状不能满足勘测定界工作要求，并且当地物、地貌变化范围超过三分之一以上时，则需要对工作底图中的地物、地形等进行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","重测",true,{"key":16,"text":17,"correct":18},"B","辅测",false,{"key":20,"text":21,"correct":18},"C","特殊补测",{"key":23,"text":24,"correct":18},"D","一般补测","工作底图的现状不能满足勘测定界工作要求时，应对用地范围附近和用地范围内的地籍要素和地形地物进行修测或补测。为了保持图件的现势性而进行的野外简易测量，称为图的补测。当地物、地貌变化范围不大时，采用一般补测；当其变化范围超过三分之一以上时，则需要进行重测或重摄。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]