[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948201":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},948201,684,1,"单选题","在以（ ）为单位的宗地面积汇总表内可以更改宗地面积。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","街道",true,{"key":16,"text":17,"correct":18},"B","行政村",false,{"key":20,"text":21,"correct":18},"C","乡(镇)",{"key":23,"text":24,"correct":18},"D","县","在以街道为单位的宗地面积汇总表内，划掉发生变更的宗地面积数，并加盖“变更”字样印章，将新增加的宗地面积加在表内。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]