[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948192":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},948192,684,1,"单选题","分割点在原界址线上时，可依申请者埋设的（ ）勘丈该分割点距两界址点距离后，计算分割点坐标。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","标志物",false,{"key":16,"text":17,"correct":18},"B","界标",true,{"key":20,"text":21,"correct":14},"C","标识",{"key":23,"text":24,"correct":14},"D","勘丈器、","宗地分割及调整边界时，应预先准备好放样数据，测设新界址点的位置，设立界标；在分割双方及有关方面同意的情况下，也可现场先设置界标，然后用解析法测量界标的坐标。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]