[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948190":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},948190,684,1,"单选题","对界址发生变化的宗地进行界址点检查中，利用原控制点或新布设的控制点，用（ ）原测量精度的方法，测量被检测的界址点坐标。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","高于",false,{"key":16,"text":17,"correct":14},"B","等于",{"key":19,"text":20,"correct":14},"C","小于",{"key":22,"text":23,"correct":24},"D","不低于",true,"在界址发生变化的宗地的界址点检查中，利用原控制点或新布设的控制点，用不低于原测量精度的方法，测量被检测的界址点坐标，用新测量的坐标与原坐标数据比较。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]