[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948176":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},948176,684,1,"单选题","变更地籍测量的基础图件是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","原宗地草图",false,{"key":16,"text":17,"correct":14},"B","土地利用现状图",{"key":19,"text":20,"correct":14},"C","原宗地图",{"key":22,"text":23,"correct":24},"D","原地籍图",true,"变更地籍测量一般不进行控制测量及测绘地籍图，而利用原界址点或原控制点作为控制，利用原地籍图作为基础图件。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]