[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-948037":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},948037,684,1,"单选题","每宗地的界址点独立编号时，界址点编号统一（ ）由“1”开始顺序编号",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","从始至终",false,{"key":16,"text":17,"correct":14},"B","从上向下",{"key":19,"text":20,"correct":21},"C","从左向右，自上而下",true,{"key":23,"text":24,"correct":14},"D","从右向左，自下而上","如果调查区内，无近期的大比例尺地形图或其他能清楚地反映宗地之间关系的图件，可按宗地进行界址点编号，即每宗地的界址点独立编号，界址点编号统一自左向右、自上而下，由“1”开始顺序编号。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]