[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-947970":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},947970,684,1,"单选题","下列内容与开展初始地籍调查的基本条件不符的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","技术培训保障",true,{"key":16,"text":17,"correct":18},"B","组织保证",false,{"key":20,"text":21,"correct":18},"C","经费保障",{"key":23,"text":24,"correct":18},"D","技术设备准备","初始地籍调查是一项政策性、技术性很强的工作，开展这项工作必须具备的条件为：①组织保证；②经费保障；③技术设备准备。",{"id":6,"name":27,"category":28,"favorite":29},"地籍调查","建筑工程",0]